Archives: Projects

900 kWp

Project Summary Project Capacity : 900 kWp (DC) Offtaker: Brembo Brakes Location of Plant:  Pune  Project was installed over a rooftop within client premises.  Project was commissioned in September 2021  Project was completed within 3 Months Total Net generation of 1420 kWh/kW/yr  

350 kWp

Project Summary Project Capacity : 350 kWp (DC) Off-taker: Transport Solutions of India (TSI) Location of Plant: Chakan, Pune Project is in OPEX Model financed by GPS Renewables Project COD : Mar’21 Type of Roof: Industrial Tin Shed Commissioning Timeline: 4 Months  Project is under Net Meter

811 kWp

Project Summary  Project Capacity : 811 kWp (DC)  Off-taker: Poona Dal and Besan  Location of Plant: Shikrapur, Pune  Project was installed Ground Mount within client primises  Project was financed by Radiance Renewable  Project was completed within 5 Months  Project commissioned in 2021

1200 kWp

Project Summary Project Capacity : 1200 kWp (DC)  Off-taker: SUTTATTI ENTRP  Location of Plant: Pune, Maharashtra  Project was installed over unit I,II,III, IV and V rooftop within same premises and connected under Net Meter.  Project was commissioned on Dec’2022  Project was completed within 6 Months  Project is constructed over multiple

7 MWp

Project Summary  Project AC Capacity : 5 MW  Off-taker: WIF, Pune  Location of Plant: Bacheri (Malshiras ), Solapur, Karnataka  Project was funded by WIF and developed by HYSOLWN Green Energy Solutions Pvt Ltd.  Project was maintained under 10 ears AMC  Project was completed within 8 months from the date of

500 kWp

Project Summary Project Capacity : 500 kWp (DC) Off-taker: Kumar’s Park Infinia Location of Plant: Fursungi, Pune  Project was installed over RCC rooftop over 22 Building in the society Project was commissioned in June 2021 Project was completed within 5 Months Project is having challenging super structure design over 4